fresh bytes
Subscribe Now

Could a robot print your next home?

Screen_Shot_2012-01-19_at_12.52.29_PM.png

It can take anywhere from six weeks to six months to build a 2,800-square-foot, two-story house in the U.S., mostly because human beings do all the work. Within the next five years, chances are that 3D printing (also known by the less catchy but more inclusive term additive manufacturing) will have become so advanced that we will be able to upload design specifications to a massive robot, press print, and watch as it spits out a concrete house in less than a day. Plenty of humans will be there, but just to ogle. via Txchnologist

Continue reading

Image: The Contour Crafting Simulation Plan for Lunar Settlement Infrastructure Build-Up.
Courtesy courtesy of Behnaz Farahi and Connor Wingfield.

Leave a Reply

featured blogs
May 6, 2026
Hollywood has struck gold with The Lord of the Rings and Dune'”so which sci-fi and fantasy books should filmmakers tackle next?...

featured paper

Want early design analysis without simulation?

Sponsored by Siemens Digital Industries Software

Traditional verification methods are failing today's complex IC designs, which require a proactive, early-stage analysis approach. A shift-left methodology addresses IP block integration challenges and the limitations of traditional simulation and ERC tools. Insight Analyzer detects hard-to-find leakage issues across power domains, enabling early analysis without full simulation. Identify inefficiencies earlier to reduce rework, improve reliability, and enhance power performance.

Click to read more!

featured chalk talk

What’s Driving Zephyr’s Momentum
In this episode of Chalk Talk, Brendon Slade from NXP and Amelia Dalton explore what Zephyr makes unique, how it compares to other RTOS options, and how its design philosophy enables developers to scale from simple prototypes to production-ready systems with confidence.
May 4, 2026
18,668 views