fresh bytes
Subscribe Now

Could a robot print your next home?

Screen_Shot_2012-01-19_at_12.52.29_PM.png

It can take anywhere from six weeks to six months to build a 2,800-square-foot, two-story house in the U.S., mostly because human beings do all the work. Within the next five years, chances are that 3D printing (also known by the less catchy but more inclusive term additive manufacturing) will have become so advanced that we will be able to upload design specifications to a massive robot, press print, and watch as it spits out a concrete house in less than a day. Plenty of humans will be there, but just to ogle. via Txchnologist

Continue reading

Image: The Contour Crafting Simulation Plan for Lunar Settlement Infrastructure Build-Up.
Courtesy courtesy of Behnaz Farahi and Connor Wingfield.

Leave a Reply

featured blogs
Feb 6, 2026
In which we meet a super-sized Arduino Uno that is making me drool with desire....

featured chalk talk

Simplifying Position Control with Advanced Stepper Motor Driver
In this episode of Chalk Talk, Jiri Keprda from STMicroelectronics and Amelia Dalton explore the benefits of the powerSTEP01 is a system-in-package from STMicroelectronics. They also examine how this solution can streamline overall position control architecture, the high level commands included in this solution and the variety of advanced diagnostics included in the powerSTEP01 system-in-package.
Jan 21, 2025
31,019 views